{"product_id":"arizona-c-78-cr-78-solar-plumbing-liquid-systems-only-residential-commercial-certification-package","title":"PSI Arizona C-78 (CR-78) Solar Plumbing, Liquid Systems Only (Residential\/Commercial) Certification Package","description":"\u003ch1\u003eTo be certified The Arizona Business Management exam must be taken as well.\u003c\/h1\u003e\n\u003cp\u003e\u003cspan style=\"text-decoration: underline;\"\u003eSCOPE OF WORK \u003c\/span\u003e\u003cbr\u003eInstallation, alteration and repair of solar water heating systems operating at temperatures not exceeding 220°F, including thermosyphon, direct (open loop) and indirect (closed loop), but excluding air as a transfer medium. Includes installation of collectors, storage and expansion tanks, heat exchangers, piping valves, pumps, sensors, and low voltage controls that connect to existing plumbing and electrical stubouts at the water tank location. Installation of solar heating systems for swimming pools that tie into and operate from the conventional pool system, but excludes all non-solar plumbing, electrical, and mechanical systems and components. Installation of back-up and auxiliary heating systems only when such systems are included in the original contract and when such systems are an integral part of the solar collector or storage equipment. \u003cbr\u003eThe trade test is considered equivalent for these classifications and upon passing the CBME and trade exam, either license classification may be applied for without further testing.\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003eThe exam is 60 questions taken over 150 minutes. The minimum required score to pass is a 70%. \u003c\/p\u003e\n\u003cp\u003eThe reference material listed above was used to prepare the questions for this examination. The examination may also contain questions based on trade knowledge or general industry practices. Except for Code books, you can base your answers on later editions of references as they become available. For Code questions, the examinations will be based only on the edition of the Code book that is listed. \u003cbr\u003e \u003cbr\u003eCandidates may use a silent, nonprinting, non-programmable calculator in the examination center.\u003c\/p\u003e\n\u003ch1\u003e\u003c\/h1\u003e\n\u003ch1\u003eThe first 3 materials can be brought into the exam center, the last 3 may not. \u003c\/h1\u003e\n\u003cp\u003e The following reference material \u003cstrong\u003eis allowed\u003c\/strong\u003e in the examination center:\u003c\/p\u003e\n\u003cp\u003eCode of Federal Regulations - 29 CFR Part 1926 (OSHA)\u003c\/p\u003e\n\u003cp\u003eInternational Plumbing Code, 2009\u003c\/p\u003e\n\u003cp\u003eInternational Mechanical Code, 2009\u003c\/p\u003e\n\u003cp\u003eThe following reference material is \u003cstrong\u003enot allowed\u003c\/strong\u003e in the examination center:\u003c\/p\u003e\n\u003cp\u003eMathematics for Plumbers and Pipefitters, 7th Edition, 2008, Cengage Learning.\u003c\/p\u003e\n\u003cp\u003eIPT's Pipe Trades Handbook\u003c\/p\u003e\n\u003cp\u003eSolar Water and Pool Heating Design and Installation Manual\u003c\/p\u003e\n\u003cp\u003eCandidates are responsible for bringing their own references to the examination center. Reference materials may be highlighted, underlined, annotated and\/or indexed prior to the examination session. However, references may not be written in during the examination session. Any candidate caught writing, highlighting, underlining and\/or indexing in the references during the examination will be reported to the Arizona Registrar of Contractors. Furthermore, candidates are not permitted to bring in any additional papers (loose or attached) with their approved references. References may be tabbed\/indexed with permanent tabs only. (permanent tabs are defined as tabs that would tear the page if removed). Temporary tabs, (defined as Post-It notes, or other tabs that may be removed without tearing the page) are not allowed and must be removed from the reference before the exam will begin. If you are downloading from the Internet, you may bring this reference into the testing center with you as long as it is bound. You can have it spiral bound or you may hole-punch it and put it in a binder. \u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cspan class=\"quick-add selected addon-only \"\u003e|title=Mandatory Business Exam|psi-arizona-buisness-management-exam-certification-package|title=Reference Materials|osha-construction-standards-regulations-29-cfr-1926|2009-international-mechanical-code|2009-international-plumbing-code|mathematics-for-plumbers-and-pipefitters|ipts-pipe-trades-handbook|solar-water-and-pool-heating-design-and-installation-manual|title=Application Service|application-service|\u003c\/span\u003e","brand":"UpStryve Book Store","offers":[{"title":"Default Title","offer_id":37496706498725,"sku":"1110000007435","price":1158.16,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0523\/1771\/6645\/products\/GEN_CONTRACTOR-G18_IMG13.jpg?v=1630614612","url":"https:\/\/bookstore-upstryve.myshopify.com\/products\/arizona-c-78-cr-78-solar-plumbing-liquid-systems-only-residential-commercial-certification-package","provider":"UpStryve Book Store","version":"1.0","type":"link"}